Main Banner

Emergency/After Hours Contact Information?

 

Water Conservation >
Sod Permits

Sod/Seed Permits Available

  • Stage 1
      • Issued April – September 30
  • Stage 2
      • Issued April 1 – May 14 (for 2010)
      • Issued September 1 – September 30    

Sod/Seed permits Not Available

  • Stage 3
  • Stage 4
  • Winter Stage
      • October 1 – March 3

Requirements

  • $50.00 permit fee
  • Sod/seed proof of purchase
  • Soil amendment proof of purchase – What is a soil amendment?
  • Area of sod/seed in square feet
  • Plot plan or drawing indicating sod/seed area(s)

Provides

  • Up to 1,500 square feet of sod/seed (for the life of the property)
  • Four weeks of daily watering to establish newly installed sod/seed

Permit Conditions

  • Permits will not be issued to over-seed
  • 1,500 square foot maximum for the life of the property
  • Permits issued the day of purchase
  • No post-dated permits
  • Watering must take place before 9 a.m. and after 6 p.m.
    • See ourNew Sod Care fact sheet for recommended watering schedule
  • Multiple permits are available under the following conditions:
    • Multiple permits may be acquired for a total of 1,500 square feet. (e.g. A permit for 750 square feet in the spring and 750 square feet in the fall will equal a total of 1,500 square feet)
    • Additional permits will be allowed provided they are used to replace the sod/seed from the original permit; however, the sod/seed must be placed on the same area